Hampton Roads Bridge Tunnel
The
HRBT is a 12 mile stretch of I-64 connecting Hampton and Norfolk across
the lower Chesapeake Bay. In addition to the above company projects, our
own Frank Roark served as Principal Project Engineer on this 1999 HRBT
conversion from TOMAC to NewTON, and the associated installation of graphical
operator's console displays, and a LED map board. Since MODCOMP® components
of the TOMAC SYSTEM were eliminated in the installation of this system,
design of a new GTIS interface was an integral part of the project. This
project was completed in 1999.
For further information on this
project see "A New Wind Blows in ITS?" Advanced Transportation
Technology News (April 1999), and "Virginia DOT uses SCADA for Tunnel
Traffic Control." Better Roads (October 2000).
|